Construction quality management software for civil earthworks
Keep lot boundaries, pavement layers and test evidence connected to the roadway. See the recorded QA status on the map and open the original reports for project review.
Card required · Cancel before the trial ends to avoid charges
Spreadsheets, generic QA platforms and ForgeLot
Most civil teams manage lot conformance in a spreadsheet or a general construction QA platform. Both hold records; neither shows you where the work actually is.
| Capability | Spreadsheet | Generic QA platform | ForgeLot |
|---|---|---|---|
| Lot register kept in one place | |||
| Lots positioned on a live satellite map | |||
| Visual lots from map-drawn control or an imported DXF alignment | |||
| Layer-by-layer conformance history on one footprint | Partial | Partial | |
| Inspection and testing status visible without opening records | Partial | ||
| Gap and overlap checks across the corridor | |||
| Areas and quantities derived from lot geometry | |||
| CSV register and printable QA pack export | |||
| Shared team workspace with roles | Partial | ||
| Change history with undo | Partial |
Comparison reflects ForgeLot's shipped features and the typical capabilities of spreadsheet registers and general-purpose construction QA platforms. Capabilities of other products vary by vendor and plan.
Quality management that speaks earthworks
ForgeLot is not a generic forms tool retro-fitted to civil work. It is built around lots, chainage and layers.
ITP status built into the map
Lots move through Awaiting Inspection, Awaiting Testing, Passed and Rework Required. The map recolours as status changes, so held work is obvious before a crew rolls onto it.
Conformance recorded layer by layer
Subgrade, capping, subbase and base course each keep their own status and history on the same lot, so a passed lower layer is never mistaken for a finished build-up.
Quality tied to real location
Every lot carries chainage, offset and geometry, so a conformance record can always be traced back to the exact ground it covers.
Registers you can hand over
Export a CSV register and a QA pack with the labelled map, recorded results and original test reports for project review and handover.
Audit trail with undo
Changes are recorded as you work, so you can see what moved, when, and roll back a mistake without rebuilding the register.
One shared source of truth
Engineers, surveyors, QA leads and the superintendent all read the same map and register instead of trading spreadsheet versions.

Progress and conformance in the same view
Completion by layer, lot counts and status breakdowns come from the same records your team updates on site, so the report is never a separate exercise.

Put your next project on the map.
No DXF needed. Draw your control line on the map, create work lots and keep every layer, test and report together.
Card required · Cancel before day 14 to avoid charges · Plans in AUD